Gnomon - School of Visual Effects
Relocation from Hollywood TVC Building to NoHo West, Los Angeles, CA
4 Weeks (During Semester Break)
"Thanks to CPM One Source, our college campus was relocated beautifully and exceeded expectations. The transition was not only a smashing success, but a seamless transition and we hit our mandated opening date." - Chris Strompolos Executive Director of Operations
Project Overview
Gnomon, a prestigious school for Visual Effects, undertook the ambitious task of relocating their entire campus from the historic Hollywood TVC Building to the modern NoHo West location in Los Angeles. This significant move was essential to provide an enhanced learning environment for their students and to accommodate their expanding operations.
Services Provided:
• Relocation Project Management
• Relocation Services
• General Contractor (GC) Coordination
• Custom Fixture Dismantling and Reassembly
Challenges
• Tight Schedule: The relocation had to be completed within a strict 4-week window during the semester break to ensure that the new campus was fully operational by the Summer semester in early July.
• Coordination with GC: Construction delays at the NoHo West site required agile project management to adapt plans and maintain the project timeline.
• Custom Fixture Management: The dismantling and reassembly of bespoke fixtures demanded meticulous attention to detail to preserve their functionality and aesthetic integrity.
Solutions
1. Comprehensive Project Management
Led by Deborah Shin, our Lead Project Manager, CPM One Source orchestrated the entire relocation process. Deborah’s expertise ensured that every aspect of the project was meticulously planned and executed, keeping the move on track despite the tight deadline.
2. Effective GC Coordination
Our team worked closely with Edward, the superintendent, to navigate construction delays. By maintaining open lines of communication and implementing flexible scheduling, we ensured that the project stayed within scope and budget.
3. Expert Installation and Moving Services
Juvenal, our Lead Installer, oversaw all large-scale installations, ensuring that custom fixtures were reassembled accurately and efficiently. Lupe Javier and Hugo, our Lead Movers, played pivotal roles in executing the physical move, handling all items with care to prevent any damage.
4. Dedicated Onsite Support
Melissa and Vivian provided essential onsite assistance, facilitating smooth communication between our crew and Gnomon’s staff. Their support was crucial in addressing any immediate concerns and ensuring a seamless transition.
Outcome
Despite the challenges, CPM One Source successfully completed the relocation within the 4-week timeframe. Gnomon transitioned smoothly to their new NoHo West campus, ready to welcome students for the Summer semester without any operational delays. The move not only upgraded their facilities but also enhanced their capacity to deliver top-tier visual effects education.